North Oconee East Campus Greenway - Athens, GA

 

This project provides a critical trail link to the University of Georgia East Campus from the newest segment of the North Oconee River Greenway, on the north side of the Upper Oconee River. Pond provided design, engineering, permitting, and construction administration services for this locally and federally-funded project that involves a quarter mile of multi-use trail. The trail consists of 10-foot-wide concrete trail, elevated concrete trail, and a 235-foot-long steel truss pre-fabricated bridge. Pond’s LA Studio served as the design lead and provided project management for this multi-disciplinary team that includes our own civil engineering staff for hydraulic modeling and subconsultants for environmental, historical, and bridge engineering work.

Related Projects

No Results Found

The page you requested could not be found. Try refining your search, or use the navigation above to locate the post.

Related News

Alex Holbrook, PE, LEED AP named Principal at Pond

Alex Holbrook, PE, LEED AP named Principal at Pond

Pond is pleased to announce the appointment of Alex Holbrook as a Principal of the firm. Holbrook has served as the Building Systems Program Director at Pond for the last three years. As a LEED Accredited professional, he brings 28 years of diverse experience with the...

Pond awarded GSA Schedule 871-7 contract

Pond awarded GSA Schedule 871-7 contract

Pond was recently awarded the U.S. General Services Administration (GSA) Schedule 871-7 contract, which encompasses construction management and engineering consulting services related to real property services. The GSA 871-7 Schedule will allow Pond to create a...

Pin It on Pinterest