Berckmans Road Widening and Realignment - Augusta, GA
This flagship TIA project in Augusta, GA is widening Berckmans Road from Wheeler Road to Washington Road and realign the northern terminus at Washington Road to connect with Alexander Drive. The proposed design consists of two travel lanes with a center turn lane from Washington Road to Wheeler Road. The project also proposes to install a roundabout at the intersection of Berckmans Rd and Ingleside Drive/ Willowridge Drive, as well as replacing the existing bridge over Rae’s Creek. Two precast arch underpasses were installed in order to accommodate the large influx of pedestrians that attend the major events at the adjacent gold club. This project was constructed in two phases, with the roundabout currently under construction. Project is on-schedule for completion in Fall 2020. Pond has served the City from Concept stage through Construction Administration.
Related Projects
Related News
Pond Appoints New Vice President for Aviation Program
Pond, an industry leader in engineering, architecture, planning, and construction management services, has hired Thomas Wilson as Vice President of the firm’s aviation group. In his role, Wilson will lead strategic oversight of the firm’s aviation program, including...
Optimizing Aviation and Aerospace Resiliency with Boeing’s New MRO Facility
Author: Eduardo Ponce | Architect | eduardo.ponce@pondco.com In 2020, Pond was selected by the Jacksonville Aviation Authority (JAA) to design and develop an 8-bay maintenance, repair and overhaul (MRO) facility at Cecil Airport on behalf of the Boeing Company and...
A Look into the SS4A Program and How Pond Can Help
Author:Wade Carroll, AICP| Director of Community and Transportation Planning | wade.carroll@pondco.com Introduction In 2021, the Bipartisan Infrastructure Law (BIL) established the Safe Streets and Roads for All (SS4A) discretionary program to prevent roadway deaths...