Medical Device Sterilization

Pond’s technical staff of specialized professionals has the expertise needed to plan, design and construct these unique and highly regulated Medical Device Sterilization operations to be safe, efficient and flexible.
Sterilization Experience:
- Ethylene Oxide (EO or EtO) Sterilization
- Gamma Sterilization
- Electron Beam (E-Beam)
Regardless of the sterilization approach needed, our team will coordinate our clients’ preferred sterilization methods and critical equipment.
Pond’s experts in permitting and building code compliance will identify all regulatory requirements for both the sterilizing equipment and the safe storage and handling of the agents utilized in the sterilization process.
Pond’s planners work with you to identify your needs and develop the ideal facility layout that will achieve your project’s quality, capacity, throughput, construction cost and schedule goals.
Our team understands the challenges of a sterilization operation and are committed to building the best solutions into your project.

Tony Pitrone
Senior Vice President
678.427.5153
Related News
Pond’s Culture Builds Basis for Success
[As featured in ENR Magazine April 30, 2018 Edition] Nearly 50 years after the firm started as a home-based business in 1965, engineering and planning firm Pond decided it was time to grow—by rapidly expanding its workforce. With engineering talent in high demand...
Streamline and simplify your next project using the Design-Build delivery process
On many construction projects, design-build delivery offers significant advantages over more traditional delivery systems including shorter construction, lower costs, continuous and unified quality control and reduced risk for the project owner. A study conducted by...
The unique challenges of bringing Industrial Solutions to life
Manufacturing is an economic engine that thrives on ingenuity and planning. Pond’s industrial team supports a variety of different industrial customers with a variety of different services. From engineering to construction, planning to line replacements, warehousing...