Pond performed this design-build, fast track project to relocate a section of 8” JP-8 fuel transfer line from DFSP Charleston to Charleston Air Force Base (AFB), which was 8 miles long. The section was directly under Interstate 26 (I-26), an active 8-lane freeway....
Pond provided design-build services at RSW which included the following projects: Tank 4 & New Off-loading Station This project included the addition of a new 10,000 BBL aboveground Jet A storage tank and all associated piping, controls and site work, as well as a...
Pond provided comprehensive architecture and engineering services to complete a new Type III Hydrant system which included upgrade of existing system for expansion of C-17 ramp and parking apron. Design included aboveground storage tanks, pumps, manual and automated...
Pond provided design-build services at PHX which included a 30 MBL tank addition and a 10” Jet A pipeline relocation. The 30 MBL tank addition involved the addition of a 30,000 BBL aboveground Jet A storage tank to the existing 120 MBL storage facility. This included...
Pond provided comprehensive planning, design, construction phase work and full-time resident inspection for multiple projects involving airport-wide expansion and upgrade of the bulk storage facility and hydrant fuel system. Project included: Fuel System Master Plan...