Pond is a prime contractor on the Defense Logistics Agency Energy (DLA-E) Cathodic Protection CMP program. On average, Pond performs 100 surveys, designs or repairs under this program annually. Systems involve jet fuel storage tanks, distribution pipelines, cross base...
Pond developed Storage Tank Management Plans for each of these facilities which had over 500 above and underground storage tanks. All types of tanks, including API and STI, were inspected to determine compliance with Final Governing Standards and OPNAVINST for...
Under contract to NAVFAC, Pond updated Spill Prevention Control and Countermeasure (SPCC) Plans to comply with new technical standards. This included updating all data sheets and performing STI SP001 inspections on all aboveground storage tanks at six US Navy...
Pond was tasked with developing a DOT compliant Integrity Management Plan for the DFSP San Pedro and its three off-site pipelines. The Plan had to comply with 49 CFR 195 requirements, as well as the specific requirements of the California State Fire Marshall. The Plan...
Pond’s ICM staff has developed detailed Operation and Maintenance Manuals at numerous DLA-E DFSPs including: DFSP San Pedro, CA DFSP Tampa, FL DFSP Verona, NY DFSP Charleston, SC Each of these facilities had off-site pipelines, as well as marine loading...