As part of a joint venture, Pond was selected to provide on-call architectural and engineering services for ongoing civil and utility projects for airside improvements to support the Hartsfield-Jackson Atlanta International Airport’s $5.4 billion Capital Improvement...
Pond provided design services to reconstruct existing 75’ by 4,560’ Runway 13/31 to allow for Air Force C-130s to train at the airfield. Design included: Permanently displacing threshold Widening two taxiways Replacing a transient parking apron Replacing a run-up ramp...
As part of the AIS Joint Venture to support the Hartsfield-Jackson Atlanta International Airport’s $5.4B Capital Improvement Program, Pond provided design services to complete this $70M project which included a hydrant fueling system tying into the existing airport...
Pond provided engineering design and full-time field construction engineering services as a member of the team selected for the airport’s architecture and engineering multi-year demand services engineering contract. Pond’s responsibilities included civil and...
Pond provided full engineering and architectural services to complete the base’s mission change from C-130 to KC-135 aircraft. The existing Petroleum, Oil & Lubricant (POL) Facility lacked the required off-loading and loading capacity and did not have a hydrant...