Hangar 21 Complex - Joint Base Andrews, MD

Hangar 21 Complex - Joint Base Andrews, MD

Hangar 21 Complex - Joint Base Andrews, MD Pond, in a Joint Venture with FSB, was awarded a contract by Naval Facilities Engineering Command (NAVFAC) Washington for architectural and engineering services for the Hangar 21 Complex. This aviation facility at Joint Base...
Runway 8L/26R - Hartsfield-Jackson Atlanta International Airport, GA

Runway 8L/26R - Hartsfield-Jackson Atlanta International Airport, GA

As part of its on-call services, the Aviation Infrastructure Solutions (AIS) Joint Venture was tasked to design the reconstruction of Runway 8L/26R and two of its high-speed taxiways. Pond and other members of the JV team, along with Atlanta Department of Aviation...
Hangar Development and Apron Paving - Harris County Airport, GA

Hangar Development and Apron Paving - Harris County Airport, GA

In order to accommodate the growing waiting list of aircraft, the Harris County Board of Commissioners requested plans and specifications be prepared to construct one 10-unit Jumbo T-Hangar and two 100’ x 100’ corporate hangars. The project scope included improving...
Taxiway Relocation - Harris County Airport, GA

Taxiway Relocation - Harris County Airport, GA

The Pond Team was selected as the consultant for Harris County Airport just after bids were received by the County for the construction of the Taxiway Relocation, designed by another firm. The 5,000-foot full-parallel taxiway was too close to the runway and did not...