Visual Air Navigation Facilities Upgrade Runway - International Airport, Charleston, SC

Pond provided electrical engineering services for replacement of the visual air navigation facilities for Runway 03-21.

Specific design elements included:

  • ALSF-1 approach lighting system utilizing low impact resistant fiberglass structures
  • REIL Lighting
  • High Intensity Runway Edge Lighting (HIRL) including threshold and end lighting. Medium Intensity Taxiway Edge Lighting (MITL) – LED
  • Runway distance remaining and taxiway guidance signs
  • Replacement of the existing 12-unit Visual Approach Slope Indicator (VASI) system with four-unit Precision Approach Path Indicator (PAPI) system on each end of Runway 03-21
  • Coordination with concurrent projects upgrading tower and vault lighting controls to computer-based system, taxiway replacements and vault replacement
  • New 5KV lighting cable in new duct bank and manhole system 400-foot Jack & Bore under Runway 15-33

Related Projects

Related News

Steve Harrill joins Pond as Aviation Architecture Practice Leader

Steve Harrill joins Pond as Aviation Architecture Practice Leader

ATLANTA – (09.20.18) – Pond, an industry leader in planning, architecture, engineering and construction services, is pleased to announce the addition of Steve Harrill as Aviation Architecture Practice Leader in our Jacksonville – South office. Harrill will be...

Pond continues success at Chicago O’Hare International Airport

Pond continues success at Chicago O’Hare International Airport

Pond has been hard at work for the O’Hare Fuel Committee (OFC) on the design and installation of new fuel transmission mains at Chicago O’Hare International Airport. The O'Hare Fuel System Improvement Program (FSIP) is part of the O’Hare Modernization Program (OMP),...

Pond featured in Airport Improvement Magazine

Pond featured in Airport Improvement Magazine

Pond Aerospace Program Manager Tim Fredlund writes about the Design-Build delivery method and utilizing the process in airfield projects for the October issue of Airport Improvement Magazine. In his Industry Insider column, "Putting the Design-Build Delivery Method to...

Pin It on Pinterest