Unicoi Bottoms Road Culvert Replacement at Smith Creek - Unicoi State Park, Helen, GA | Georgia Department of Natural Resources

Pond has an on-call services contract with the GADNR to perform rehabilitation services for their Category I and II Dams along with other infrastructure needs within the state parks. The culvert on Unicoi Bottoms Road, just south of the Unicoi State Park Inn, washed out from the excessive rainfall events of May 2018. This impeded access to the lodge and facilities from the south side of the park.

Structure Replacement: Reinforced Concrete Slab Top Bridge, 30-ft span, resting on socketed pile footings.

Services:
Provided survey for the project area; Hydrologic and Hydraulic Assessment to size different structures for cost and efficiency for type and geometry structure selection; construction documents; and construction oversight.

Related Projects

Related News

Pond announces acquisition of Landmark Engineering

Pond announces acquisition of Landmark Engineering

Pond, an international engineering, architecture, planning, and construction firm headquartered in Peachtree Corners, Ga., announces the acquisition of Jacksonville, Fla.-based Landmark Engineering. With the acquisition of Landmark, Pond strengthens its Transportation...

Pond’s Mableton Town Square in Cobb County garners design award

Pond’s Mableton Town Square in Cobb County garners design award

Pond was recently selected by the American Council of Engineering Companies of Georgia (ACEC Georgia) and the Georgia Department of Transportation (GDOT) as the winner of the Georgia Partnership for Transportation Quality (GPTQ) award for the work done on the Mableton...

Pin It on Pinterest