Unicoi Bottoms Road Culvert Replacement at Smith Creek - Unicoi State Park, Helen, GA | Georgia Department of Natural Resources

Pond has an on-call services contract with the GADNR to perform rehabilitation services for their Category I and II Dams along with other infrastructure needs within the state parks. The culvert on Unicoi Bottoms Road, just south of the Unicoi State Park Inn, washed out from the excessive rainfall events of May 2018. This impeded access to the lodge and facilities from the south side of the park.

Structure Replacement: Reinforced Concrete Slab Top Bridge, 30-ft span, resting on socketed pile footings.

Services:
Provided survey for the project area; Hydrologic and Hydraulic Assessment to size different structures for cost and efficiency for type and geometry structure selection; construction documents; and construction oversight.

Related Projects

Related News

Goddard Joins Pond as Senior Environmental Project Manager

Goddard Joins Pond as Senior Environmental Project Manager

TAMPA, FL - (May 18, 2023) – Pond, a leader in engineering, architecture, planning and construction management services, today announced that Nate Goddard, PWS, has joined the firm as a Senior Environmental Project Manager. In this role, Goddard will work with the...

Pond Expands Presence in Southeastern Coastal Corridor

Pond Expands Presence in Southeastern Coastal Corridor

SAVANNAH, GA - (February 13, 2023) —Pond announced today it is accelerating its presence along the southeastern coast with the promotion of Stephen Bailey to Coastal Strategic Growth Lead. Bailey, who has relocated to Pond’s Savannah office, will focus on growing...

Pin It on Pinterest