Unicoi Bottoms Road Culvert Replacement at Smith Creek - Unicoi State Park, Helen, GA | Georgia Department of Natural Resources
Pond has an on-call services contract with the GADNR to perform rehabilitation services for their Category I and II Dams along with other infrastructure needs within the state parks. The culvert on Unicoi Bottoms Road, just south of the Unicoi State Park Inn, washed out from the excessive rainfall events of May 2018. This impeded access to the lodge and facilities from the south side of the park.
Structure Replacement: Reinforced Concrete Slab Top Bridge, 30-ft span, resting on socketed pile footings.
Services:
Provided survey for the project area; Hydrologic and Hydraulic Assessment to size different structures for cost and efficiency for type and geometry structure selection; construction documents; and construction oversight.
Related Projects
Related News
Clif Payne Joins Pond as Senior Scientist and Environmental Lead for Firm’s Florida Operations
ATLANTA, GA - (July 17, 2023) – Pond today announced that Clif Payne has joined the firm’s Environmental and Water Resources Group as a Senior Scientist and Environmental Lead in Florida. In this role, Payne will support Pond’s environmental services for clients...
Goddard Joins Pond as Senior Environmental Project Manager
TAMPA, FL - (May 18, 2023) – Pond, a leader in engineering, architecture, planning and construction management services, today announced that Nate Goddard, PWS, has joined the firm as a Senior Environmental Project Manager. In this role, Goddard will work with the...
Pond Announces Key Promotions in Environmental & Water Resources Group
ATLANTA, GA - (May 2, 2023) – Pond today announced three promotions within its Environmental & Water Resources (EWR) group – key management moves which strengthen the firm’s industry-leading engineering, architecture, planning, and construction services: Glenn...