Underground Storage Tank Repairs - Davis-Monthan Air Force Base, Tucson, AZ

Pond performed design, repair and construction of military fuel distribution and storage systems through a Master Services Agreement with IT Corporation. Projects included required tank repairs and installation of new high and low level control switches in the existing 19 underground JP-8 storage tanks at three facilities (pumphouses); 202 (five tanks), 206 (nine tanks) and 207 (five tanks).

 

Other type of work involved:

  • Installation of new high and low level control panels and equipment for each tank at the three storage facilities.
  • Cleaning and vapor freeing of each 19 underground fuel tanks at three pump stations, JP-8 facilities.
  • Interior epoxy coating of each 19 underground fuel tanks at three pump stations, including sand blasting and epoxy coating per standard military specifications (MIL-P-24441).
  • Tank modifications including enlarging 14 tank manways and adding additional manways.
  • Installation of new concrete pits with aluminum covers around new manways.
  • API 653 ultrasonic testing on 19 underground fuel tanks.
  • Upgrades to manual and control valving.

Related Projects

Related News

No Results Found

The page you requested could not be found. Try refining your search, or use the navigation above to locate the post.

Pin It on Pinterest