Title II Services for Fuel Infrastructure Inspection & Repair - Masirah Island, Oman

Pond provided Title II inspection, oversight, subject matter expertise and engineering services for a multi-phase Petroleum, Oil & Lubricant (POL) project. The construction project consists of Phases I-IV and includes inspection, repair and replacement of fuel pipelines, a hydrant fueling system, cut-and-cover tanks, cathodic protection systems, upgrade of receipt fuel filtration, and provision of a fill stand.

Phase I: Repair 1.7 miles of 12” diameter Fuel Pipeline

  • Repaired by replacement 1.7 miles of 12“ fuel pipeline in accordance with UFC 3-460-01.
  • Prepared an Implementation Work Plan detailing the construction, materials and pipe coating system suitable for resisting corrosion.
  • Witnessed pipeline pressure test after construction to support commissioning. Demolition of existing 12” pipeline and supports.
  • Provided construction QA inspections to ensure pipeline was constructed IAW plans and specifications.

Phase II: Testing and Repair of POL Facilities

  • Project included modified API 653 inspection of six (6) 30,000 bbl cut-and-cover tanks used to store jet fuel. The contractor made recommendations for repairs based on the results of the inspections and was subsequently awarded significant repair tasks.
  • Pond reviewed safety and cleaning processes, witnessing the inspections. Pond also reviewed the recommendations and provided recommendations and pricing review to AFCEE.
  • Pond is the Subject Matter Expert on the project team on tank inspection and repair. Significant corrosion issues were noted requiring engineered evaluations of the tanks’ repairs.

Phase III: Testing and Repair of Underground Fuel Lines

  • Oversaw API 570 inspections using Long Range Guided Wave Ultrasonic Pipe Screening type guided wave integrity testing and inspection of above and below ground transfer lines.
  • Reviewed and witnessed inspection of cathodic protection system.
  • Several defects were noted in the pipe including an active leak in the piping at POL 2. Pond provided immediate direction to minimize the impact and ensure contractor was safe in any activity in the impacted area.

Related Projects

Related News

Pond continues success at Chicago O’Hare International Airport

Pond continues success at Chicago O’Hare International Airport

Pond has been hard at work for the O’Hare Fuel Committee (OFC) on the design and installation of new fuel transmission mains at Chicago O’Hare International Airport. The O'Hare Fuel System Improvement Program (FSIP) is part of the O’Hare Modernization Program (OMP),...

Pond celebrates safety accomplishments during project

Pond celebrates safety accomplishments during project

The Pond constructors team recently celebrated its safety accomplishments while working on two new 37,000 bbl jet fuel storage tanks. Since the start of field efforts, the Pond team has worked 9,617 man-hours on the project without experiencing any injuries. While the...

Pond provides quick response to BWI cargo tank farm repairs

Pond provides quick response to BWI cargo tank farm repairs

Pond recently performed an emergency response to reactivate a moth ball fuel system at Baltimore/ Washington International Thurgood Marshall Airport (BWI Marshall) for a new cargo carrier at its midfield facility. Pond performed quick turnaround as a REG system needed...

Pin It on Pinterest