Predator LRE Aircraft Maintenance Hangar - Fort Huachuca, AZ

Pond designed the facility, for the 214th Reconnaissance Group, to support maintenance for the MQ-1B Predator unmanned aerial vehicle (UAV). The facility consists of a single general maintenance hangar bay sized to accommodate four (4) MQ-1B Predator aircraft or three (3) MQ-9 Reaper aircraft. Also provided is a general purpose / maintenance shop, engine maintenance shop, avionics shop, battery charging room, administrative, conference room / break room, storage, mechanical, electrical, communications, fire protection, restrooms and break room.

This aircraft maintenance hangar is pursuing LEED® Silver Certification with USGBC. On-site renewable energy was pursued by using photo-voltaic panels to offset a minimum of 3% of the building’s energy costs. Also, solar power is used for generating hot water for the facility. Overall, energy recovery and other strategies were used to achieve a minimum 30% energy cost savings below the IESNA / ASHRAE 90.1 baseline.

Related Projects

Related News

The Military Engineer features “Taking Advantage of Nature”

The Military Engineer features “Taking Advantage of Nature”

Senior Electrical Engineer Clifford Daniel discusses renewable energy sources and Pond's creative solutions for utilizing them at the St. Croix Air National Guard Station in the U.S. Virgin Islands for the current issue of The Military Engineer. In the May-June issue,...

PAANG Celebrates Ribbon Cutting of New Flight Simulator

PAANG Celebrates Ribbon Cutting of New Flight Simulator

Pond’s Greg Culpepper (Principal / National Guard Bureau Programs Operation Manger), Mark Hanselman (Senior Structural Engineering), Chris Jenkins (Principal / Director of Structural Engineering), and Mark Susa (Senior Associate / National Guard Bureau Program Leader)...

Pin It on Pinterest