Metro PCS Switch & Office Renovations - Norcross, GA
Pond provided design-build services for the construction of this 12,500 square foot switch office facility involving in-house design services, procurement of critical support equipment (generator, UPS, HVAC and DC power equipment) and complete oversight of the construction process. Three 20 ton water cooled computer room dx air conditioning units were installed. Two five ton water cooled ceiling mounted air conditioning units were utilized. A 300 kw generator set with 500 amps ATS along with a 40 kva/40KW UPS system was installed to provide adequate redundancy on the project.
Related Projects
Related News
Virtual Design and Construction: Harnessing the power of 3-D modeling to save time and cost
Pond's Bryan Schroeder, Director of Virtual Design and Construction, discusses the importance of Virtual Design and Construction (VDC) in the Fall 2017 issue of Ingenuity Magazine. Virtual Design and Construction examines VCD technology and how Building Information...
Pond ranks in the top 100 on MEP Giants List
Pond is thrilled to announce our recent ranking in the top 100 on Consulting-Specifying Engineer's 2017 MEP Giants List. The MEP Giants program lists the top mechanical, electrical, plumbing and fire protection engineering firms in the United States and provides...
Pond celebrates groundbreaking at Colt Creek State Park
Pond was excited to be part of the groundbreaking ceremony for the construction of a new recreational vehicle and camping facility at Colt Creek State Park last week. Under direction of the Florida Department of Environmental Protection, Pond has completed the design...