Renovations to Special Operations Forces Administration Building - Fort Bragg, NC
Pond provided complete design, including 100% construction plans and specifications, for the renovation of a Special Operations Forces (SOF) building. The building was repurposed from an existing 1990s building. Minor civil site renovations were also required.
A design charrette was held on site to define users’ needs, outline SOF requirements, and review the existing condition of the building. Preliminary review provided valuable insight for the reuse portions of the existing mechanical system.
-
FF&E design development
-
HVAC system design
-
Integrated fire alarm system
-
ADA upgrades throughout
Related Projects
Related News
Pond honored for notable contributions to SAME
Pond was honored to be selected as the Seymour S. Greenfield Sustaining Member Award winner for 2017. Senior Project Manager Pam Little joined Executive Vice President John Cassidy, Vice President Mike Magahey, Program Manager George Fragulis, Program Manager Steve...
Virtual Design and Construction: Harnessing the power of 3-D modeling to save time and cost
Pond's Bryan Schroeder, Director of Virtual Design and Construction, discusses the importance of Virtual Design and Construction (VDC) in the Fall 2017 issue of Ingenuity Magazine. Virtual Design and Construction examines VCD technology and how Building Information...
Pond ranks in the top 100 on MEP Giants List
Pond is thrilled to announce our recent ranking in the top 100 on Consulting-Specifying Engineer's 2017 MEP Giants List. The MEP Giants program lists the top mechanical, electrical, plumbing and fire protection engineering firms in the United States and provides...