As part of the AIS Joint Venture to support the Hartsfield-Jackson Atlanta International Airport’s $5.4B Capital Improvement Program, Pond provided design services to complete this $70M project which included a hydrant fueling system tying into the existing airport system on the aircraft parking apron and entry/exit taxiways, utilities, including taxiway lighting and guidance signage, barrier/warning lights, and de-icing fluid collection and management system to support the new international terminal.

Significant features included:

  • 200,000 SY apron, taxiway paving and underground utilities
  • Phasing to ensure facilities remain operational during construction
  • Design packages for accelerated portions of construction to coordinate with other schedules
  • Coordinating fueling hydrant layout scheme with design of international terminal
  • Design of a fueling hydrant system to accommodate a 12-gate layout, tie into the existing fueling hydrant system, and accommodate future expansion
  • Design of on-apron de-icing area and glycol collection system with monitoring and metered release for Ramp 9
  • Modification of the existing glycol collection systems on Ramps 6 North and South included design of new on-apron glycol collection lift station to force main on Ramp 8
  • Taxiway lighting and guidance signage for Ramps 8 and 9, Taxiway ‘L’s northern edge, and tie-in’s to existing Taxiways ‘D’ and ‘L’ lighting
  • Design of both Ramps 8 and 9 to be partially surrounded by jersey barrier walls and fencing with obstruction lighting at the edge of the taxi lane safety area

Related Projects

Related News

Steve Harrill joins Pond as Aviation Architecture Practice Leader

Steve Harrill joins Pond as Aviation Architecture Practice Leader

ATLANTA – (09.20.18) – Pond, an industry leader in planning, architecture, engineering and construction services, is pleased to announce the addition of Steve Harrill as Aviation Architecture Practice Leader in our Jacksonville – South office. Harrill will be...

Pond continues success at Chicago O’Hare International Airport

Pond continues success at Chicago O’Hare International Airport

Pond has been hard at work for the O’Hare Fuel Committee (OFC) on the design and installation of new fuel transmission mains at Chicago O’Hare International Airport. The O'Hare Fuel System Improvement Program (FSIP) is part of the O’Hare Modernization Program (OMP),...

Pond featured in Airport Improvement Magazine

Pond featured in Airport Improvement Magazine

Pond Aerospace Program Manager Tim Fredlund writes about the Design-Build delivery method and utilizing the process in airfield projects for the October issue of Airport Improvement Magazine. In his Industry Insider column, "Putting the Design-Build Delivery Method to...

Pin It on Pinterest