Sprint Local Telephone Division Generator, UPS, & Electrical Upgrade - Bristol, TN

Pond provided electrical upgrades to a three building complex of 91,700 square feet that serves as a Local Telephone Exchange Central Office, two Data Centers and office space. This project required installing a new 1500 KW generator to support the entire complex to replace a generator that only served one of the buildings. All of the Mission Critical Data Center loads in the three buildings were consolidated into a 150 KVA parallel-redundant UPS system employing three static switches. The needs of multiple end users were met and all UPS “cut-covers” were accomplished “hot” utilizing Methods of Procedure (MOPs) to describe critical construction procedures. A new single 480/277V electrical service was installed to replace two existing 208/120V services. All of the existing electrical distribution was surveyed and replaced with new feeders and older or obsolete panels were upgraded.

Related Projects

Related News

No Results Found

The page you requested could not be found. Try refining your search, or use the navigation above to locate the post.

Pin It on Pinterest