Little River Dam No. 31 - City of Milton, GA

Pond has completed the hydrologic and hydraulic (H&H) assessment phase for the NRCS and GASDP (Georgia Safe Dams Program). This phase consisted of performing an updated H&H study to see if the dam meets current regulatory requirements for the NRCS and GASDP. Also included for this phase was the development of the breach study, Emergency Action Plan (EAP), and the GASDP Inspection. The next phase that Pond is working on is the rehabilitation design for the auxiliary spillways and stabilization outlet basins for the exit channels.

Related Projects

Related News

No Results Found

The page you requested could not be found. Try refining your search, or use the navigation above to locate the post.

Pin It on Pinterest