Integrity Management Plan - DFSP San Pedro, CA

Pond was tasked with developing a DOT compliant Integrity Management Plan for the DFSP San Pedro and its three off-site pipelines. The Plan had to comply with 49 CFR 195 requirements, as well as the specific requirements of the California State Fire Marshall. The Plan was developed to allow for a variety of inspection methods including in-line inspection and ECDA. Pond also performed the Baseline Assessment as part of this effort.
Related Projects
Related News
Pond Leads the Pack for PHMSA Mega Rule Compliance Services
“The Mega Rule regulation will be transformative in how we approach compliance, safe distribution, and data collection. This is an opportunity to increase the performance of your asset and enhance the reliability of its output for years to come. The significant...
Brian Lunsford Promoted to Vice President of Asset Integrity at Pond
ATLANTA – (07.16.19) – Pond, an industry leader in engineering, construction, planning and architecture services announces the promotion of Brian Lunsford, PE to Vice President of their Asset Integrity Program. In this role, Brian will utilize his specialized...
Bryan Evans Promoted to Senior Vice President of Pond’s Energy Division
ATLANTA – (8.27.18) – Pond, an industry leader in engineering, planning, architecture, and construction management announced the promotion of Bryan Evans to Senior Vice President of Pond’s Energy Division. In his expanded role, Evans will lead the Energy Group...