Holcomb Bridge Road at 400 Corridor Study - Roswell, GA
Pond performed a study of the Holcomb Bridge Road / SR 400 corridor. This study examined land use and transportation needs associated with the SR 400 interchange and adjacent intersections. The study included analysis and concept development for a variety of potential solutions to enhance traffic flow along the corridor for traffic traveling through the area, to/from this section of Holcomb Bridge Road, and within the corridor and between interchange quadrants. The study considered transit, pedestrian, and bicycle travel as well as automobile travel.
The study utilized land use recommendations resulting from a detailed charrette process performed by Pond as part of the City’s Comprehensive Plan update, the results of which were coordinated with the corridor study.
Related Projects
Related News
Pond’s Mableton Town Square in Cobb County garners design award
Pond was recently selected by the American Council of Engineering Companies of Georgia (ACEC Georgia) and the Georgia Department of Transportation (GDOT) as the winner of the Georgia Partnership for Transportation Quality (GPTQ) award for the work done on the Mableton...
Complete Streets Enhancing Suburban Life
Urban hubs across the country have proudly proclaimed their allegiance to “Complete Streets,” supposed metaphorical honey for young, affluent millennials as they flock to downtowns nationwide. In contrast to traditional streets and roadways, which are predominantly...
Tabatha Carlton Joins Pond’s New Tampa, Florida Office
November 18, 2015, Atlanta, GA - A new office and a proven engineer will expand Pond & Company’s presence in Tampa, Florida. Tabatha Carlton, P.E., a new addition to the Pond team, will be coordinating the Tampa office, which will focus on providing transportation...