Holcomb Bridge Road at 400 Corridor Study - Roswell, GA

Pond performed a study of the Holcomb Bridge Road / SR 400 corridor. This study examined land use and transportation needs associated with the SR 400 interchange and adjacent intersections. The study included analysis and concept development for a variety of potential solutions to enhance traffic flow along the corridor for traffic traveling through the area, to/from this section of Holcomb Bridge Road, and within the corridor and between interchange quadrants. The study considered transit, pedestrian, and bicycle travel as well as automobile travel.
The study utilized land use recommendations resulting from a detailed charrette process performed by Pond as part of the City’s Comprehensive Plan update, the results of which were coordinated with the corridor study.
Related Projects
Related News
Tom Margle joins Pond as Relationship Development Manager in Columbia, SC office
ATLANTA – (07.01.19) – Pond, an industry leader in engineering, construction, planning and architecture services, has added Tom Margle to expand Pond’s footprint for DoD, transportation, aviation, environmental and construction projects across the Carolinas from our...
Pond promotes Richard Fangmann to Vice President
ATLANTA, Georgia – (08.20.18) – Pond, an industry leader in engineering, planning, architecture, and construction services, announces the promotion of Richard Fangmann, PE PTOE to Vice President of Transportation. Richard Fangmann has over 26 years of experience in...
Pond Jacksonville gears up for Construction Career Days
Every year, Pond's Jacksonville office and its Financial Manager, Donna McQuade, plan, fund raise and work to ensure the success of the local Jacksonville Construction Career Days. Construction Career Days was started in 1999 by transportation industry officials to...