Hangar Development and Apron Paving - Harris County Airport, GA
In order to accommodate the growing waiting list of aircraft, the Harris County Board of Commissioners requested plans and specifications be prepared to construct one 10-unit Jumbo T-Hangar and two 100’ x 100’ corporate hangars. The project scope included improving the site drainage; constructing approximately 7,600 square feet of apron/taxilane expansion pavement; relocating existing and installing new electrical and water utilities; and constructing a new 2,500 linear foot access road. Critical phasing and scheduling was required to ensure the contractor met the extremely aggressive schedule required by the Commission. In addition to design services, the Pond Team performed construction administration and resident inspection services.
Related Projects
Related News
Pond Project Earns Envision Silver Award
ATLANTA – (12.20.19) – Pond, an industry leader in engineering, architecture, planning and construction services, is pleased to announce that the Institute for Sustainable Infrastructure (ISI) has recognized our partner, Hartsfield-Jackson Atlanta International...
Aviation Infrastructure Solutions JV Team Awarded Contract with Hartsfield-Jackson Atlanta International Airport
Team will Provide Architectural and Engineering Services to Enhance Airport Experience ATLANTA – (01.15.19) The Aviation Infrastructure Solutions (AIS) Joint Venture was recently awarded a multi-year contract for Architectural and Engineering Design Services at...
Pond develops conceptual architectural design for the Cecil Airport
Pond’s Aviation team was pleased to develop the conceptual architectural design for the Jacksonville Aviation Authority (JAA) to replace the existing Air Traffic Control Tower (ATCT) at Cecil Airport in Jacksonville, Florida. As a subconsultant to RS&H, Pond was...