Widening of SR 17 - Franklin County, GA

This project included the design for the widening of approximately 4 miles of SR 17 from the Stephens County line to I-85. The project included realignment and improvements to the intersections at the I-85 interchange ramps as well as a new intersection at the proposed Lavonia By-Pass. The proposed improvements include widening to a four lane rural roadway with a 44’ depressed grassed median for a majority of the improved roadway. The existing bridge over I-85 was widened and raised. An extensive part of the widening design included coordination with the existing railroad adjacent which runs parallel to the roadway. The design also included the development of an extensive storm drainage system and modifications to the I-85 ramps. The proposed widening provides a four lane section with both urban and depressed grass medians. Pond managed the preparation of an Environmental Assessment and all related environmental special studies. Key environmental tasks included: waters delineation & permitting; protected species evaluation; air & noise analysis; cultural resources; Section 4(f) evaluation; and environmental justice.

Related Projects

Related News

Pond’s Culture Builds Basis for Success

Pond’s Culture Builds Basis for Success

[As featured in ENR Magazine April 30, 2018 Edition] Nearly 50 years after the firm started as a home-based business in 1965, engineering and planning firm Pond decided it was time to grow—by rapidly expanding its workforce. With engineering talent in high demand...

Pond Jacksonville gears up for Construction Career Days

Pond Jacksonville gears up for Construction Career Days

Every year, Pond's Jacksonville office and its Financial Manager, Donna McQuade, plan, fund raise and work to ensure the success of the local Jacksonville Construction Career Days. Construction Career Days was started in 1999 by transportation industry officials to...

Pin It on Pinterest