Widening of SR 17 - Franklin County, GA

This project included the design for the widening of approximately 4 miles of SR 17 from the Stephens County line to I-85. The project included realignment and improvements to the intersections at the I-85 interchange ramps as well as a new intersection at the proposed Lavonia By-Pass. The proposed improvements include widening to a four lane rural roadway with a 44’ depressed grassed median for a majority of the improved roadway. The existing bridge over I-85 was widened and raised. An extensive part of the widening design included coordination with the existing railroad adjacent which runs parallel to the roadway. The design also included the development of an extensive storm drainage system and modifications to the I-85 ramps. The proposed widening provides a four lane section with both urban and depressed grass medians. Pond managed the preparation of an Environmental Assessment and all related environmental special studies. Key environmental tasks included: waters delineation & permitting; protected species evaluation; air & noise analysis; cultural resources; Section 4(f) evaluation; and environmental justice.

Related Projects

Related News

Goddard Joins Pond as Senior Environmental Project Manager

Goddard Joins Pond as Senior Environmental Project Manager

TAMPA, FL - (May 18, 2023) – Pond, a leader in engineering, architecture, planning and construction management services, today announced that Nate Goddard, PWS, has joined the firm as a Senior Environmental Project Manager. In this role, Goddard will work with the...

Restoration and Resiliency: A Watershed Approach

Restoration and Resiliency: A Watershed Approach

Our dynamic natural environment is ever-changing, affecting our coastlines, floodplains, rivers, lakes, and streams with higher intensity precipitation events resulting in increased stormwater runoff and water surface elevations, most notably in southeastern portions...

Pin It on Pinterest