Fuel Pipeline Replacement & Cathodic Protection for Tanks 4 & 5 - Naval Air Station Fallon, NV
Pond provided design-build services for this project which included installation of approximately 1,200 linear feet of 10” underground jet fuel piping from the existing main filter separator and repair to nine existing aircraft refueling stations, fill stands, and off-loading islands. The replacement piping and fittings were constructed of stainless steel and airfield lighting system. The types of work required by this design-build project were renovation, repair, and alteration and consisted of the following:
- Completion of underground piping system.
- Installation of stainless steel above ground piping & supports.
- Installation of cathodic protection system for underground piping and existing Tanks 4 & 5.
- Installation of new 12 conduit electrical duct bank.
- Repair of fill stand and off-loading.
- Installation of new 6” PVC water line.
- Installation of two new aqueous film forming foam water connection and new eyewash stations.
- Urgent repairs to airfield lighting system.
Notable challenges involved phased construction to keep aircraft fueling operations fully functional throughout construction; operation on a live hot refueling apron; and challenging logistics caused by the remote location of the base.
Related Projects
Related News
Pond Featured in PaintSquare Press
Coatings Program Manager David Hunter discusses the Undeniable Value of Coatings Condition Surveys in the Summer edition of PaintSquare Press. His article (located on pages 8-11) explores the dangers of forgoing thorough, quality control procedures. He provides case...
Bryan Evans Promoted to Senior Vice President of Pond’s Energy Division
ATLANTA – (8.27.18) – Pond, an industry leader in engineering, planning, architecture, and construction management announced the promotion of Bryan Evans to Senior Vice President of Pond’s Energy Division. In his expanded role, Evans will lead the Energy Group...
Pond’s Culture Builds Basis for Success
[As featured in ENR Magazine April 30, 2018 Edition] Nearly 50 years after the firm started as a home-based business in 1965, engineering and planning firm Pond decided it was time to grow—by rapidly expanding its workforce. With engineering talent in high demand...