Florida Public Utilities | New Smyrna Beach Lateral Pipeline - New Smyrna Beach, FL
For the New Smyrna Beach Lateral Pipeline project Pond provided engineering design and permitting, environmental evaluation and permitting, and land acquisition assistance as required for FPU’s contractor to construct the project. This project, intended to replace an existing lateral with SMYS and pressure concerns, involves approximately 15.6 miles of 8” and 6” pipeline construction.
Additionally, Pond provided GPS collection during construction to document pipeline construction, and prepare as-built drawings based on the collected information.
Key Elements:
Design of approximately 15.6 miles (83,700 LF) of eight (8) and six (6) inch nominal diameter steel gas pipeline installation from Florida Gas Transmission’s (FGT) Daytona Lateral to FPU’s existing district regulator station in New Smyrna Beach. The pipe has an MAOP of 575 psig.
Acquisition of property for a new gate station near FGT’s Daytona Lateral.
Acquisition of easements and/or temporary workspace as required at planned HDD and crossing sites.
Survey and geotechnical investigation along the entire project corridor.
Right-of-way permitting including US-92, I-4, Tomoka Farms Rd, Pioneer Trail, and Turnbull Bay Road.
Environmental Permitting with the US Army Corps of Engineers (USACE) and Florida Department of Environmental Protection (FDEP)
Evaluation of the existing cathodic protection system and design of new cathodic protection facilities.
Evaluation of AC interference and design of mitigation.
Collection of GPS data during construction, including weld numbers, joint numbers, heat numbers, and fittings.
Preparation of as-built drawings upon completion of construction.
Related Projects
Related News
ENR Ranks Pond Among Top 50 International Design Firms for Petroleum
ATLANTA, GA - (December 15, 2023) – Pond, an industry leader in engineering, architecture, planning and construction management services is proud to be recognized by Engineering News-Record (ENR) as a Top 50 International Design Firm in the petroleum sector. According...
GSI-Pond Joint Venture Awarded Task Order Under NAVFAC EXWC IDIQ Contract at Joint Base Pearl Harbor-Hickam, Hawaii
ATLANTA, GA - (October 5, 2023) – Pond and joint-venture (JV) partner, GSI, today announced the award of a task order under the existing Naval Facilities Engineering and Expeditionary Warfare Center (NAVFAC EXWC) Global Petroleum, Oils, and Lubricants (GPOL)...
GSI-Pond Joint Venture Awarded Task Order Under Existing NAVFAC EXWC IDIQ Contract
ATLANTA, GA - (July 20, 2023) – Pond and joint-venture (JV) partner, GSI, today announced the award of a task order under the existing Naval Facilities Engineering Command Expeditionary Warfare Center (NAVFAC EXWC administered by NAVFAC SE CORE Environmental)...