First Army Headquarters Renovation - Rock Island Arsenal, IL

Under a JV contract with the Louisville District, the Pond team provided full A/E services for complete (100%) construction documents for the rehabilitation of administrative and office space in Building 68, a historic three-story property built in 1881. The space was renovated to meet the mission requirements for First Army Headquarters. Modifications included HVAC; replacing communications; building security systems; replacing windows, streets and parking lots; and rehabilitating the building’s interior, which encompassed space planning, interior design, and lighting. An uninterruptible power supply and emergency generator was included to support the First Army Operations Center and the Command Center.

As an add-on to A/E design services, the team provided Title II services, to include all aspects of Design During Construction (DDC), and Supervisory and Administrative services (S&A). DDC includes value-engineering change proposal review, change order preparation, and furniture selection after competitive bid by USACE Huntsville. S&A services include full-time, on-site support; construction-phase services (shop-drawing review); responding to RFIs; LEED® Validation oversight; and coordination of contracts handled by other Corps Divisions, such as the Furniture Contract and contracts issued to install communications and VTC systems.

Project elements include: space planning, comprehensive interior design (CID); seismic design for existing construction; energy conservation; plans and specifications, a bid schedule, a submittal register, quantity and MCACES (MII) cost estimates; a phased construction schedule; design analysis and calculations; a design documentation report; civil site engineering including site visits and investigations; utility investigations; AT/FP; sustainable design to achieve LEED® Silver Certification; and communications engineering.

Related Projects

Related News

Pond celebrates groundbreaking at Colt Creek State Park

Pond celebrates groundbreaking at Colt Creek State Park

Pond was excited to be part of the groundbreaking ceremony for the construction of a new recreational vehicle and camping facility at Colt Creek State Park last week. Under direction of the Florida Department of Environmental Protection, Pond has completed the design...

George Fragulis featured in The Military Engineer

George Fragulis featured in The Military Engineer

Program Manager George Fragulis discusses planning, scheduling and the importance of teamwork in his article, "Working Through Multiple Funding Sources and Compressed Schedules" for the July-August issue of The Military Engineer. In the article, Fragulis talks about...

Customer Service Center at Maxwell Road evolves with the County

Customer Service Center at Maxwell Road evolves with the County

Situated on approximately 35 acres in Alpharetta, Georgia, the Customer Service Center at Maxwell Road, formerly known as the Water Resources Operation Center, has evolved with Fulton County's needs since its completion in 2016. Originally, the project consisted of a...

Pin It on Pinterest