Parris Island Facility Assessments - Marine Corps Recruit Depot Parris Island, SC
For the Naval Facilities Engineering Command, Pond provided facility auditing services for 50 facilities totaling 1,624,260 square feet at the Marine Corps Recruit Depot (MCRD) Parris Island, South Carolina. Pond’s architects and engineers conducted detailed energy and water surveys of the identified facilities and their associated systems and reviewed all available utility information. In addition, the audit services consisted of investigating and identifying Energy Conservation Opportunities (ECOs); developing applicable ECOs into Energy Conservation Measures (ECMs) on each facility in the following areas: renewable energy projects, mechanical, electrical, building envelopes and water conservation projects; and summarizing the ECMs with their associated life cycle costs and their Savings to Investment Ratio (SIR) into one consolidated report. The established ECMs were organized and categorized in the following manner:
- Retro-commissioning (effective operation of current systems)
- Steam & Condensate Systems
- Boiler Plant Modifications
- Heating, Ventilating & Air Conditioning
- Weatherization
- Lighting Systems
- Energy Recovery Systems
- Electrical Energy Systems
- Renewable Energy Systems
- Facility Energy Improvements
- Water Conservation
The results of these facility assessments will enable MCRD Parris Island to meet and exceed Federal Energy Reduction Legislation and will establish a master energy and water conservation plan for the implementation of future projects to improve energy and water efficiencies. Across the 50 buildings, projected energy savings are averaging above a 10% reduction. In some facilities, a 20% energy reduction can be achieved with the proposed energy conservation measures. Our team is estimating nearly half a million dollars in annual savings if all measures are implemented.
Related Projects
Related News
Understanding NPRM DIMP: Inspections, Tests, and Miscellaneous Amendments
Author: Andy Lawton, PE | Principal, Program Director & Utilities Market Leader | andy.lawton@pondco.com Introduction In early 2023, the Pipeline and Hazardous Materials Safety Administration (PHMSA) proposed revisions to the pipeline safety regulations for...
Pond’s Eva Gonzales Selected for SAME 2024-2025 Leader Development Class
ATLANTA - (April 2, 2024) – Pond, an industry leader in engineering, architecture, planning and construction management services, is proud to recognize Eva Gonzales, PE for her selection to the Society of American Military Engineers (SAME) 2024-2025 Leader Development...
The EV Landscape and How Pond Provides Comprehensive Solutions in Today’s Energy Economy
Author:Delaney Akridge| Staff Writer | delaney.akridge@pondco.comIntroduction: Planning for the Future of Electric Vehicle Infrastructure With electric vehicles (EVs) and hybrids surpassing 16% of total US light-duty vehicle sales in 2023, the future of a fully...