Combined Arms Collective Training Facility - Camp Blanding Joint Training Center, FL
As part of the comprehensive redevelopment of the Camp Blanding Joint Training Center, Pond provided comprehensive A/E services for this Combined Arms Collective Training Facility (CACTF).
-
Adaptive reuse of 19 buildings
-
Retrofit of 8 building
-
Construction of 18 new buildings to the MOUT
-
Sustainable design utilizing LEED
-
Utility, topographic and hazardous materials survey over 18 acres
-
Cost management plan
Related Projects
No Results Found
The page you requested could not be found. Try refining your search, or use the navigation above to locate the post.
Related News
The 104th Fighter Wing F-15’s Get a Newly Renovated Home
WESTFIELD, MASS. - (3.9.18) - More than a hundred attendees joined Senator Elizabeth Warren, Congressman Richard Neil, Governor Charlie Baker, and Major General Gary W. Keefe for the 104th Fighter Wing’s main hangar renovation ribbon cutting at Barnes Air National...
Virtual Design and Construction: Harnessing the power of 3-D modeling to save time and cost
Pond's Bryan Schroeder, Director of Virtual Design and Construction, discusses the importance of Virtual Design and Construction (VDC) in the Fall 2017 issue of Ingenuity Magazine. Virtual Design and Construction examines VCD technology and how Building Information...
Maryland Air National Guard breaks ground on 175th Cyberspace Operations Facility
Pond President and CEO Tony Parker and Program Manager Greg Culpepper recently attended the groundbreaking of the 175th Cyberspace Operations Facility at Fort George Meade, MD. The $5 million, 9,000 square foot project is the first building at Ft. Meade for the...