Pond completed the master plan and schematic design for the full build out of the 14.2 acre site including the evaluation of an existing structure to determine viability for reuse rather than demolition and if the site’s existing detention pond could be utilized by Fire-ES for SCUBA diving instructional purposes and for other training simulations.

The preliminary concept master plan developed for the proposed Cherokee County Fire-ES Training Center was comprised of the following components:

  • A single story training administration building to hold administrative offices and support areas, teaching and instruction classrooms (partially located within the existing structure).
  • A two story fire training burn building. A four story fire training tower.
  • An exterior covered classroom area, to be located in close proximity to both the training administration building and the fire training props.
  • A physical fitness and exercise center, locker rooms and shower facilities for male and female personnel.
  • A two bay drive through garage of sufficient size to hold an EMS ambulance and a fire/pumper truck for training purposes.
  • A wash bay with equipment and storage rooms.
  • A storage building for hay bales, wooden pallets and other similar “burn” materials.
  • Drafting area at the existing pond with boat ramp, provisions for future dock, and pump area for a pond-fed hydrant system to be used for live fire training.
  • A vehicle extraction training area. An exterior (LP) gas prop area with all necessary infrastructure and utility components.

Related Projects

Related News

Construction of Cobb County Fire Station #18 underway

Construction of Cobb County Fire Station #18 underway

Construction of Cobb County Fire Station #18, located on Mars Hill Road in Acworth, is well underway with a projected completion date in September 2018. Pond Constructors was selected to provide CM-at-Risk construction services for this project, which broke ground in...

Pond celebrates groundbreaking at Colt Creek State Park

Pond celebrates groundbreaking at Colt Creek State Park

Pond was excited to be part of the groundbreaking ceremony for the construction of a new recreational vehicle and camping facility at Colt Creek State Park last week. Under direction of the Florida Department of Environmental Protection, Pond has completed the design...

Pin It on Pinterest