Berckmans Road Widening and Realignment - Augusta, GA
This flagship TIA project in Augusta, GA is widening Berckmans Road from Wheeler Road to Washington Road and realign the northern terminus at Washington Road to connect with Alexander Drive. The proposed design consists of two travel lanes with a center turn lane from Washington Road to Wheeler Road. The project also proposes to install a roundabout at the intersection of Berckmans Rd and Ingleside Drive/ Willowridge Drive, as well as replacing the existing bridge over Rae’s Creek. Two precast arch underpasses were installed in order to accommodate the large influx of pedestrians that attend the major events at the adjacent gold club. This project was constructed in two phases, with the roundabout currently under construction. Project is on-schedule for completion in Fall 2020. Pond has served the City from Concept stage through Construction Administration.
Related Projects
Related News
Aviation Infrastructure Solutions JV Team Awarded Contract with Hartsfield-Jackson Atlanta International Airport
Team will Provide Architectural and Engineering Services to Enhance Airport Experience ATLANTA – (01.15.19) The Aviation Infrastructure Solutions (AIS) Joint Venture was recently awarded a multi-year contract for Architectural and Engineering Design Services at...
Pond announces new leaders in the firm
Pond, an industry leader in planning, architecture, engineering and construction services, is proud to recognize individuals who demonstrate extensive knowledge in their respective fields with promotions to Senior Associate. These individuals are leaders in their...
Pond completes design and construction services for Lockheed Martin’s new Hercules Training Center
Pond recently completed design and construction services for Lockheed Martin’s new Hercules Training Center, a 6,500 square-foot building that houses a reconfigurable full motion simulator for C-130J and LM-100J training. The LM-100J is able to perform as a civil,...