Berckmans Road Widening and Realignment - Augusta, GA
This flagship TIA project in Augusta, GA is widening Berckmans Road from Wheeler Road to Washington Road and realign the northern terminus at Washington Road to connect with Alexander Drive. The proposed design consists of two travel lanes with a center turn lane from Washington Road to Wheeler Road. The project also proposes to install a roundabout at the intersection of Berckmans Rd and Ingleside Drive/ Willowridge Drive, as well as replacing the existing bridge over Rae’s Creek. Two precast arch underpasses were installed in order to accommodate the large influx of pedestrians that attend the major events at the adjacent gold club. This project was constructed in two phases, with the roundabout currently under construction. Project is on-schedule for completion in Fall 2020. Pond has served the City from Concept stage through Construction Administration.
Related Projects
Related News
Richard Fangmann presented with the Karl Bevins Distinguished Service Award
Pond's Richard Fangmann was presented the Karl Bevins Distinguished Service Award Thursday, December 15, at the annual Georgia Section of the Institute of Transportation Engineers (ITE) meeting. Recipients of this award have demonstrated the qualities of competence,...
Pond’s Mableton Town Square in Cobb County garners design award
Pond was recently selected by the American Council of Engineering Companies of Georgia (ACEC Georgia) and the Georgia Department of Transportation (GDOT) as the winner of the Georgia Partnership for Transportation Quality (GPTQ) award for the work done on the Mableton...
Pond Awarded Contract to Design Hangar for future Air Force One Aircraft
Pond, in a Joint Venture with FSB, was awarded a contract by Naval Facilities Engineering Command (NAVFAC) Washington for architectural and engineering services for the Hangar 21 Complex. This aviation facility at Joint Base Andrews will support the proposed Boeing...