Atlanta Gas Light (AGL) | Northeast Georgia Expansion (NGX) 24″ Transmission Line - Marietta, GA

This project consists of approximately 10-miles of 24” steel transmission pipeline with a planned MAOP of 1200-psig. Pond provided engineering design, survey, SUE, cathodic protection design, environmental services and land acquisition services as well as construction administration and support services. This project included two mainline valve stations with remote monitoring and wireless communication, the demolition and tie-in to existing facilities as well as multiple directional drill designs. In addition to engineering and AC Mitigation design in-house, Pond managed subcontractors including topographic and SUE survey, environmental services, land acquisition, geotechnical analysis, landscaping repair estimates and analysis and septic system evaluation.

KEY ELEMENTS:
This project involves coordination with existing high pressure lines to address tie-ins and protection of existing systems during construction. Numerous installation methods were evaluated throughout the project to determine the one best suited for each roadway, stream or wetland crossing within the narrow construction corridor.
Installation of approximately 10 miles of 24” diameter high pressure pipeline.
This project passes through a heavily developed area with significant landowner, utility and constructability challenges driving multiple unexpected design changes through the design cycle of the project.

Related Projects

Related News

Natural Gas Infrastructure Expertise Recognized by ACEC

Natural Gas Infrastructure Expertise Recognized by ACEC

Atlanta, GA - During the past 25 years, Atlanta's metropolitan area has experienced rapid growth, and much of that growth has taken place in areas such as Duluth, which is farther removed from Atlanta Gas Light's existing interstate supply points and high-pressure...

Kris Allegood, PE Named Vice President of Aviation Fueling

Kris Allegood, PE Named Vice President of Aviation Fueling

Pond, an industry leader in planning, architecture, engineering and construction services, is announcing the promotion of Kris Allegood to the position of vice president. Kris is primarily responsibe for Pond’s Aviation Fueling division. He has been tasked with...

Pin It on Pinterest