Army Reserve Center - Greensboro, NC

The Greensboro Army Reserve Center contains a 2-story Training Center Building (77,740 sf), an Organizational Maintenance Shop (3,858 sf), an Unheated Storage Building (3,949 sf), a 2-bay Washrack, MEP lot, DEPMEDS lot, and a privately owned vehicle (POV) lot. The Pond team won this competitive Design-Build project by successfully developing the advertised design-build RFP into a functional, cost effective, high quality facility.

In order to best protect and preserve the environment, the facility and site design incorporated many sustainable design techniques while staying within the established budget. The project was designed to achieve a LEED® Silver Certification.

The combination of an energy efficient envelope and high-efficiency HVAC systems result in a highly efficient facility.  The LEED® Energy Cost Savings calculated is 36.4%. Additionally, design requirements were to provide an energy consumption savings minus receptacle and process loads (EPAct 2005) of 40% over a baseline building.  Calculations indicate a 45% improvement over baseline.

Related Projects

Related News

Pond honored for notable contributions to SAME

Pond honored for notable contributions to SAME

Pond was honored to be selected as the Seymour S. Greenfield Sustaining Member Award winner for 2017. Senior Project Manager Pam Little joined Executive Vice President John Cassidy, Vice President Mike Magahey, Program Manager George Fragulis, Program Manager Steve...

Pond ranks in the top 100 on MEP Giants List

Pond ranks in the top 100 on MEP Giants List

Pond is thrilled to announce our recent ranking in the top 100 on Consulting-Specifying Engineer's 2017 MEP Giants List. The MEP Giants program lists the top mechanical, electrical, plumbing and fire protection engineering firms in the United States and provides...

Pin It on Pinterest