Army Reserve Center - Greensboro, NC

The Greensboro Army Reserve Center contains a 2-story Training Center Building (77,740 sf), an Organizational Maintenance Shop (3,858 sf), an Unheated Storage Building (3,949 sf), a 2-bay Washrack, MEP lot, DEPMEDS lot, and a privately owned vehicle (POV) lot. The Pond team won this competitive Design-Build project by successfully developing the advertised design-build RFP into a functional, cost effective, high quality facility.

In order to best protect and preserve the environment, the facility and site design incorporated many sustainable design techniques while staying within the established budget. The project was designed to achieve a LEED® Silver Certification.

The combination of an energy efficient envelope and high-efficiency HVAC systems result in a highly efficient facility.  The LEED® Energy Cost Savings calculated is 36.4%. Additionally, design requirements were to provide an energy consumption savings minus receptacle and process loads (EPAct 2005) of 40% over a baseline building.  Calculations indicate a 45% improvement over baseline.

Related Projects

Related News

Centrifuge Research Laboratory is a Work in Progress

Centrifuge Research Laboratory is a Work in Progress

Raymond-Pond JV Helps U.S. Army Engineer Research and Development Center’s Centrifuge Research Laboratory Get Back in Operation By Matt Allinson, PMP, GGP, Col, USAF (Ret.) | Senior Project Manager | Pond The U.S. Army Engineer Research and Development Center (ERDC)...

Will Curry joins Pond as Mechanical Technical Director

Will Curry joins Pond as Mechanical Technical Director

ATLANTA – (03.11.19) – Pond, an industry leader in engineering, construction, planning and architecture services, has added William Curry as Mechanical Technical Director to its Peachtree Corners, Georgia office. Curry is a professional engineer with over 30 years of...

Pin It on Pinterest