Alter Vehicle Maintenance Facility - Ellington Field Joint Reserve Base, Houston, TX
Pond provided full A/E services (Type A and Type B) for renovations and alterations to an existing Vehicle Maintenance Facility. The design includes offices, classroom, break room, technical library, dispatch, and restrooms with lockers, along with specialized spaces for vehicle general maintenance and repair and a welding shop. Renovations and alterations were in accordance with Air National Guard (ANG) standard facility requirements ANGH 32-1084 Sustainable Design utilizing LEED.
-
ASTM and IBC 2009, as referenced by UFC 1-200-01, governed design
-
International Building Code used for material requirements
-
ADA accessibility throughout facility
-
Meets AFOSH standards
-
Specifications using UFGS and UFC requirements
-
Design and survey for asbestos abatement – flooring and glue
The final phase of the Holiday Inn Express and Suites, Phenix City, AL, guestroom and public space renovation wrapped up this summer, tallying yet another successful hotel project for the Pond Interiors team. Holiday Inn Express and Suites now offers a completely redesigned lobby, public space, breakfast area in compliance to the formula blue scheme and modernized guestrooms.
The public space portion of the project began with the complete demolition of the existing lobby and breakfast room. The reconfigured floor plan maximizes the usage of the space, and creates an open and welcoming communal setting for guests to enjoy. A renovated lobby, modern lounge areas, and a breakfast buffet were all strategically redesigned to flow with the lobby’s stylish new look. The existing casegoods were able to be reused in guestrooms, however, the guestrooms and guest bathrooms have received modem facelifts.
Related Projects
Related News
Maryland Air National Guard breaks ground on 175th Cyberspace Operations Facility
Pond President and CEO Tony Parker and Program Manager Greg Culpepper recently attended the groundbreaking of the 175th Cyberspace Operations Facility at Fort George Meade, MD. The $5 million, 9,000 square foot project is the first building at Ft. Meade for the...
Rhode Island National Guard’s new Joint Force Headquarters breaks ground
Pond Senior Vice President Christopher Farnie recently attended the groundbreaking of the Rhode Island National Guard’s new Joint Force Headquarters building. Also in attendance were RI Governor Gina Raimondo, U.S. Senator Jack Reed, Adjutant General Christopher...
The Military Engineer features “Taking Advantage of Nature”
Senior Electrical Engineer Clifford Daniel discusses renewable energy sources and Pond's creative solutions for utilizing them at the St. Croix Air National Guard Station in the U.S. Virgin Islands for the current issue of The Military Engineer. In the May-June issue,...