Alter Squadron Operations and Aircraft Maintenance Facility - Homestead Air Reserve Base, FL
Pond provided full A/E services for 100% construction documents for a new 16,000 sf addition and renovation of 25,200 sf of the existing Squadron Operations/Aircraft Maintenance Building 191. The new construction was designed to be compatible with the existing facility and to satisfy all administrative training and storage requirements.
Project elements include:
- Demolition of adjacent aircraft pavements
- Utilities
- Selective demolition of building elements
- Sitework
- Earthwork
- Utilities and a building addition consisting of HVAC systems, plumbing, fire protection, power, lighting, telecommunications, fire alarm, and security systems.
This addition was designed to meet LEED Silver Certification criteria.
Related Projects
Related News
Raymond-Pond Enterprise Solutions Awarded $40M Contract for A-E Services and Multi-Discipline Construction Projects to Robins AFB, GA
ATLANTA – July 13, 2022 – Pond and its joint venture partner, Raymond Engineering (Raymond-Pond), have been awarded a new $40 million indefinite-delivery/ indefinite-quantity (IDIQ) contract to provide architecture and engineering (A-E) services to the 78th Air Base...
Partnering To Success At Fort Jackson
Fort Jackson is the largest initial entry training center in the U.S. Army, training an estimated 50 percent of all new soldiers each year. Providing the Army with new freshly trained soldiers is the one of the post’s primary missions. Pond partnered with Fort Jackson...
Q&A with Bob Ruch
Bob Ruch, Col. Ret., PE is Pond’s Executive Vice President, Defense & Federal. He has been in the industry for 5 years since retirement from a distinguished 30-year career with the U.S. Army and U.S. Army Corps of Engineers. While serving with USACE, he commanded...