A380 Modifications - Los Angeles International Airport, Bradley International Terminal, CA

Pond provided hydrant system modifications and new hydrant pits for the Airbus A380 at LAX. Projects included:

  • Positioning the new hydrant pit locations to operate with the different aircrafts that will also utilize the A380 gate.
  • Adding new hydrant pits on both sides of the aircraft to minimize refueling and overall turn around time.
  • Reworking the twin 12” supply lines allowing redundant capability from the hydrant system if maintenance is needed on one of the lines.
  • Relocating an existing 16′ hydrant loop supply line due to the gate expansion, including evaluation of pressure control, MOV and valve pit.
  • Relocating an emergency fuel shut off (EFSO) automated control stations.

Related Projects

Related News

Pond featured in Airport Improvement Magazine

Pond featured in Airport Improvement Magazine

Pond Aerospace Program Manager Tim Fredlund writes about the Design-Build delivery method and utilizing the process in airfield projects for the October issue of Airport Improvement Magazine. In his Industry Insider column, "Putting the Design-Build Delivery Method to...

Pond provides quick response to BWI cargo tank farm repairs

Pond provides quick response to BWI cargo tank farm repairs

Pond recently performed an emergency response to reactivate a moth ball fuel system at Baltimore/ Washington International Thurgood Marshall Airport (BWI Marshall) for a new cargo carrier at its midfield facility. Pond performed quick turnaround as a REG system needed...

Pin It on Pinterest