A380 Modifications - Los Angeles International Airport, Bradley International Terminal, CA
Pond provided hydrant system modifications and new hydrant pits for the Airbus A380 at LAX. Projects included:
- Positioning the new hydrant pit locations to operate with the different aircrafts that will also utilize the A380 gate.
- Adding new hydrant pits on both sides of the aircraft to minimize refueling and overall turn around time.
- Reworking the twin 12” supply lines allowing redundant capability from the hydrant system if maintenance is needed on one of the lines.
- Relocating an existing 16′ hydrant loop supply line due to the gate expansion, including evaluation of pressure control, MOV and valve pit.
- Relocating an emergency fuel shut off (EFSO) automated control stations.
Related Projects
Related News
Bryan Evans Promoted to Senior Vice President of Pond’s Energy Division
ATLANTA – (8.27.18) – Pond, an industry leader in engineering, planning, architecture, and construction management announced the promotion of Bryan Evans to Senior Vice President of Pond’s Energy Division. In his expanded role, Evans will lead the Energy Group...
Pond’s Culture Builds Basis for Success
[As featured in ENR Magazine April 30, 2018 Edition] Nearly 50 years after the firm started as a home-based business in 1965, engineering and planning firm Pond decided it was time to grow—by rapidly expanding its workforce. With engineering talent in high demand...
Nisha Joshi joins Pond Energy as Senior Project Manager serving North Texas
ATLANTA, Georgia – (7.25.18) – Pond, an industry leader in planning, architecture, engineering and construction services, announced today, the addition of Nisha Joshi to Pond. As a licensed Professional Engineer, Nisha Joshi brings thirteen years of experience in Oil...