A380 Modifications - Los Angeles International Airport, Bradley International Terminal, CA
Pond provided hydrant system modifications and new hydrant pits for the Airbus A380 at LAX. Projects included:
- Positioning the new hydrant pit locations to operate with the different aircrafts that will also utilize the A380 gate.
- Adding new hydrant pits on both sides of the aircraft to minimize refueling and overall turn around time.
- Reworking the twin 12” supply lines allowing redundant capability from the hydrant system if maintenance is needed on one of the lines.
- Relocating an existing 16′ hydrant loop supply line due to the gate expansion, including evaluation of pressure control, MOV and valve pit.
- Relocating an emergency fuel shut off (EFSO) automated control stations.
Related Projects
Related News
Aviation Infrastructure Solutions JV Team Awarded Contract with Hartsfield-Jackson Atlanta International Airport
Team will Provide Architectural and Engineering Services to Enhance Airport Experience ATLANTA – (01.15.19) The Aviation Infrastructure Solutions (AIS) Joint Venture was recently awarded a multi-year contract for Architectural and Engineering Design Services at...
Pond develops conceptual architectural design for the Cecil Airport
Pond’s Aviation team was pleased to develop the conceptual architectural design for the Jacksonville Aviation Authority (JAA) to replace the existing Air Traffic Control Tower (ATCT) at Cecil Airport in Jacksonville, Florida. As a subconsultant to RS&H, Pond was...
Steve Harrill joins Pond as Aviation Architecture Practice Leader
ATLANTA – (09.20.18) – Pond, an industry leader in planning, architecture, engineering and construction services, is pleased to announce the addition of Steve Harrill as Aviation Architecture Practice Leader in our Jacksonville – South office. Harrill will be...