Runway 8R Replacement - Hartsfield-Jackson Atlanta International Airport, GA
As part of a joint venture, Pond is providing on-call architectural and engineering services for ongoing civil and utility projects for airside improvements to support the Hartsfield-Jackson Atlanta International Airport’s $5.4 billion Capital Improvement Program.
This project included reconstruction of the 10,000 foot runway and parallel taxiway within a 60-day construction window. The $91,500,000 project included 265,000 SY of 20” concrete pavement, 20,000 tons of asphalt paving, with an additional 30,000 CY of fill concrete to repair the existing stabilized base and shoulders. Other elements included a pavement underdrain system and airfield lighting.
Related Projects
Related News
Pond Project Earns Envision Silver Award
ATLANTA – (12.20.19) – Pond, an industry leader in engineering, architecture, planning and construction services, is pleased to announce that the Institute for Sustainable Infrastructure (ISI) has recognized our partner, Hartsfield-Jackson Atlanta International...
Aviation Infrastructure Solutions JV Team Awarded Contract with Hartsfield-Jackson Atlanta International Airport
Team will Provide Architectural and Engineering Services to Enhance Airport Experience ATLANTA – (01.15.19) The Aviation Infrastructure Solutions (AIS) Joint Venture was recently awarded a multi-year contract for Architectural and Engineering Design Services at...
Pond develops conceptual architectural design for the Cecil Airport
Pond’s Aviation team was pleased to develop the conceptual architectural design for the Jacksonville Aviation Authority (JAA) to replace the existing Air Traffic Control Tower (ATCT) at Cecil Airport in Jacksonville, Florida. As a subconsultant to RS&H, Pond was...