Bachelor Enlisted Quarters, EOD School - Eglin Air Force Base, FL
Pond provided design/build services for this new 4-story 57,000 sf building consisting of 2+2 modules and common support areas to accommodate a maximum of 240 personnel. The architectural design provides an efficient design of stacked floor plates with shared common spaces on each floor.
Other additions included new parking areas, two pavilions, and other site enhancements. Meeting the requirements of the Base ACP, each pavilion consists of a 12′ classic square shape with power, natural gas, grill, benches and trash receptacles. Incorporated into the landscaping design are berms, planters, and bollards to meet force protection requirements. The project incorporated LEED® Sustainable design standards.
Related Projects
Related News
Pond Ranked as One of Atlanta’s Largest Architectural Firms
ATLANTA, GA - (December 1, 2023) – Pond, an industry leader in engineering, architecture, planning and construction management services is proud to be recognized again by the Atlanta Business Chronicle as one of Atlanta’s 25 Largest Architectural Firms. Pond ranks...
Cassie Beckwith Joins Pond as Senior Architect and Architecture Practice Lead for Firm’s Savannah Office
SAVANNAH, GA - (September 13, 2023) – Pond today announced that Cassie Beckwith, RA, NCARB, LEED AP, has joined the firm as Senior Architect and Architecture Practice Lead for the firm’s Savannah, Georgia office. Beckwith will be responsible for managing the...
Pond Awarded Contract to Design New Quick Start Training Center
ATLANTA, GA - (June 5, 2023) – Through a partnership with the Georgia State Financing and Investment Commission (GSFIC), the Technical College System of Georgia (TCSG), and Quick Start, Pond has been awarded a contract to provide architecture and engineering services...