Operations and Maintenance Manuals - CONUS DLA-E Facilities, CA, FL, NY

Pond’s ICM staff has developed detailed Operation and Maintenance Manuals at numerous DLA-E DFSPs including:

  • DFSP San Pedro, CA

  • DFSP Tampa, FL

  • DFSP Verona, NY

  • DFSP Charleston, SC

Each of these facilities had off-site pipelines, as well as marine loading facilities requiring the Manuals to comply with US DOT 49 CFR 195 requirements and USCG 49 CFR 154 requirements. Pond developed schematic diagrams and valve tables as part of the plan development.

Related Projects

Related News

William Anderson Promoted to Vice President of Energy

William Anderson Promoted to Vice President of Energy

ATLANTA – (11.12.21) – Pond, one of the fastest growing architecture and engineering firms in the country, is proud to announce the promotion of William Anderson to Associate Principal and Vice President of Energy. In his new role, William will lead Pond’s Commercial...

Sasan Hosein Promoted to Vice President of Corrosion Services

Sasan Hosein Promoted to Vice President of Corrosion Services

ATLANTA – (01.12.21) – Pond, an industry leader in engineering, construction, planning and architecture services, is pleased to announce the promotion of Sasan Hosein to Vice President of Corrosion Protection Services. In this role, Hosein will oversee the engineering...

Pin It on Pinterest